Drilling Has Started at Prismo Metals' Palos Verdes Project

In This Article:

VANCOUVER, BC / ACCESSWIRE / September 24, 2024 / Prismo Metals Inc. (CSE:PRIZ)(OTCQB:PMOMF)(FSE:7KU) ("Prismo" or the "Company") is pleased to announce that drilling at its Palos Verdes project in Mexico has started. Hole PV-24-34 of this collaborative drilling program with Vizsla Silver Corp's (TSXV:VZLA) ("Vizsla") was collared on Vizsla's property. The planned length of the first hole is 250 meters out of a total expected 1,250 meters in the first phase of the program now underway.

Dr. Craig Gibson, Co-Founder and Chief Exploration Officer of the Company explained: "The goal of the first phase of drilling is designed to explore the vein system to the west of the fault below the zone of bonanza grade intercepts from the previous campaigns. We expect the first hole to cut both the Palos Verdes vein as well as the higher gold-silver vein about 50 meters downdip from the previous intersections. Assays reported from last year's drilling include hole PV-23-25 with 102 g/t gold, 3,100 g/t silver and 0.26% zinc over 0.5 meters, or 11,520 g/t silver equivalent - the highest-grade intercept recorded at the project to date (see News Release of July 27, 2023)."

As announced on July 31st, 2024, Prismo's team mobilized at Palos Verdes in early August and immediately began preparation for the drill program with strategic partner Vizsla. The plan as designed will allow to test targets on the Palos Verdes concession with greater efficiency by utilizing drill pads located on Vizsla's concessions adjacent to Palos Verdes.

"Getting to this stage is the result of joint efforts from both the Prismo and Vizsla teams in Mexico," said Alain Lambert, CEO of Prismo. "The planning and preparation effort included our team and our driller's team learning Vizsla's safety, work and environmental protocols before work could begin as the drill pads are located on their ground. Also, the type of drill permit obtained by Vizsla allows for sites to be accessed by man-portable equipment. Furthermore, the rugged nature of the terrain required that the access to the site and the site itself be done by hand, lengthening the team's preparation time. We have now reached the drilling phase."

Lambert added: "We are very excited to resume drilling the Palos Verdes vein system which has already returned outstanding results. Combined with our fully permitted Hot Breccia copper project in the heart of the Arizona copper belt, Prismo expects a very active second half of 2024 with multiple drill results from these two world class exploration projects." For more information about the drill campaign, please watch Prismo's latest video at: https://www.youtube.com/watch?v=FX116H1a2qA