Endurance Announces First 2024 Drill Results At The Reliance Gold Project, BC; Initial Six Holes Expand Imperial Zone With High-Grade Gold Mineralization

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - September 17, 2024) - Endurance Gold Corporation (TSXV: EDG) (OTC Pink: ENDGF) (FSE: 3EG) (the "Company") is pleased to announce preliminary assay results from the first six (6) diamond drill holes completed in the Imperial and Diplomat Zones at its Reliance Gold Project. The planned 2024 drilling program consists of up to 10,000 metres ("m") of diamond drilling designed to expand the gold zones discovered within the 2-km long Royal Shear structure. To date, eleven (11) drill holes have been completed for over 3,500 m.

Highlight assay results from the Imperial Zone DDH24-083 through DDH24-088 include:

  • 2.19 gpt gold over 12.1 m; including 11.95 gpt gold over 0.6 m and 7.92 gpt gold over 1.1 m

  • 5.41 gpt gold over 4.1 m; including 11.15 gpt gold over 1.2 m

  • 1.94 gpt gold over 12.3 m; including 7.53 gpt gold over 1.0 m and 5.11 gpt gold over 2.0 m

  • 6.80 gpt gold over 4.3 m; including 13.70 gpt gold over 2.0 m

  • 3.26 gpt gold over 4.3 m

  • 2.98 gpt gold over 4.7 m; including 6.72 gpt gold over 1.0 m

"The Reliance Gold Project continues to deliver exciting drill results that demonstrate a strong gold system. The current drilling is expanding the Imperial, Eagle, Crown and Diplomat zones hosted within the 2-km long Royal Shear" stated Robert T. Boyd, CEO of Endurance Gold Corporation. "Assay results from these step-out holes indicate that the gold system is still open to expansion along strike and to depth. We look forward to additional results as we test the northwest extensions of the Eagle Zone and the undrilled gap between Eagle and Imperial that includes the Crown Zone".

The Imperial Zone has been expanded along strike for over 100 m to the northwest where it remains open to expansion. In addition, these drill holes also intersected the Diplomat Zone which is now confirmed with several intersections to be a secondary deeper mineralized zone in the footwall that underlies and is parallel to the Imperial Zone echoing a similar structural relationship as seen at the Eagle Zone.

All drill hole results reported are over 10 gram-metre, exceeded the company's minimum requirement to report as a significant intersection which must include at least 3.0 m of consistent gold mineralization. A complete list of assay results is reported in Table 1. All results are reported as core length intervals. True composite widths are estimated at 70% to 100% of core length. Highlighted intervals are shown on the Royal Shear longitudinal section in Figure 1, and drill collar location for these holes identified on the Royal Shear plan map in Figure 2.