F3 Expands B1 Shear by 80% with 700m Step-Out Hole

In this article:

Hits 0.71m of Off-Scale (>65,535cps) within 12.0m of Mineralization at JR

Kelowna, British Columbia--(Newsfile Corp. - August 13, 2024) - F3 Uranium Corp (TSXV: FUU) (OTCQB: FUUFF) ("F3" or "the Company") is pleased to announce recent JR Zone high grade infill summer drilling highlighted by PLN24-161, which intersected mineralization over 12.0m, including 2.0m of high grade (>10,000cps) also hosting 0.71m of composite off-scale mineralization (>65,535 cps). Drill hole PLN24-163 at JR intersected 0.90m of composite high grade mineralization (>10,000 cps) within 20.5m of mineralization (>300cps). JR Zone infill holes targeted areas of low drill hole density within the high-grade core of the zone. These holes help to improve and define the continuity of grade within the JR Zone.

F3 engaged Computational Geosciences to provide new geologically constrained inversions of ground loop time domain electromagnetic (GTEM) and direct current (DC) resistivity data already collected on the ground. These parametric models of electric conductivity (see Figure 1) defined a clear extension of the B1 trend which was tested and validated with drillhole PLN24-168, a 700m step-out along strike from PLN24-126, which was the most southeasterly hole along the B1 shear zone previously and 1,300m from its northwest end. Drill hole PLN24-168 intersected a 14.2m strongly prospective and wide clay altered graphitic shear zone approximately 110m below the Athabasca Unconformity in the down-dip direction (see Photo 1). Additionally, the inversion indicated the B1 conductor trend to continue to the southeast an additional 700m to the edge of the survey block resulting in an approximate 80% increase in the total implied strike length of the B1 shear zone to 2.7km.

Sam Hartmann, Vice President Exploration, commented:

"PLN24-168 was collared on line 4245S, approximately 1.2 km along strike from the Harrison Fault and PLN24-152 area, opening up an additional 700m of prospective strike from previous drilling. This wildcat hole was collared conservatively, testing the newly defined conductive feature well below the Athabasca Unconformity; an altered and strongly graphitic shear representing the continuation of B1 was intersected as predicted from the conductivity model; it also exhibited elevated radioactivity averaging 200 cps peaking up to 240cps; although that doesn't quite meet our reporting threshold of 300 cps, it adds to the prospectivity and follow-up holes are now being planned for that area. Geochemistry results from this ongoing drill program are being integrated into our models and drill plans as they arrive which is assisting us with targeting with greater confidence."

Figure 1

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/219744_d09f67fd247b8b6d_002full.jpg

Summer 2024 JR Zone Handheld Spectrometer Highlights:

PLN24-161 (line 035S):

  • 12.0m interval with mineralization from 205.0m to 217.0m, including

    • 0.71m composite off-scale radioactivity (> 65,535 cps) between 208.2m and 209.25m

PLN24-163 (line 095S):

  • 20.5m interval of mineralization between 197.0m to 217.5m, including

0.90m composite high-grade mineralization (> 10,000 cps) between 205.25 m and 206.5m

Summer 2024 Exploration Handheld Spectrometer Highlights:

PLN24-167 (line 3450S): B1 Exploration

  • 0.5m mineralized interval from 453.5m to 454.0m

Photo 1: PLN24-168 - 700m Step-Out Along Strike at B1

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/219744_d09f67fd247b8b6d_003full.jpg

Table 1. Drill Hole Summary and Handheld Spectrometer Results

Collar Information

* Hand-held Spectrometer Results On Mineralized Drillcore (>300 cps / >0.5m minimum)

Athabasca Unconformity Depth (m)

Total Drillhole Depth (m)

Hole ID

Section Line

Easting

Northing

Elevation

Az

Dip

From (m)

To (m)

Interval (m)

Max CPS

PLN24-161

035S

587791.0

6410763.9

546.4

-80.3

57.0

205.00

205.50

0.50

460

179.8

269

205.50

206.00

0.50

<300

206.00

206.50

0.50

450

206.50

207.00

0.50

1500

207.00

207.50

0.50

3800

207.50

208.00

0.50

50600

208.00

208.20

0.20

44000

208.20

208.50

0.30

>65535

208.50

208.66

0.16

>65535

208.66

208.80

0.14

62700

208.80

208.90

0.10

>65535

208.90

209.00

0.10

56700

209.00

209.10

0.10

53700

209.10

209.25

0.15

>65535

209.25

209.50

0.25

52200

209.50

210.00

0.50

8800

210.00

210.50

0.50

3900

210.50

211.00

0.50

1800

211.00

211.50

0.50

910

211.50

212.00

0.50

1800

212.00

212.50

0.50

6500

212.50

213.00

0.50

4200

213.00

213.50

0.50

980

213.50

214.00

0.50

960

214.00

214.50

0.50

9100

214.50

215.00

0.50

4600

215.00

215.50

0.50

4300

215.50

216.00

0.50

15900

216.00

216.50

0.50

1200

216.50

217.00

0.50

950

PLN24-162

2850S

589301.3

6408383.6

538.0

-67.9

54.5

426.50

427.00

0.50

340

184.0

521

PLN24-163

095S

587813.1

6410709.8

546.9

-78.5

52.4

194.00

194.50

0.50

310

181.33

305

197.00

197.50

0.50

760

197.50

198.00

0.50

<300

198.00

198.50

0.50

400

198.50

199.00

0.50

640

199.00

199.50

0.50

580

199.50

200.00

0.50

3700

200.00

200.50

0.50

1200

200.50

201.00

0.50

540

201.00

201.50

0.50

580

201.50

202.00

0.50

300

202.00

202.50

0.50

410

202.50

203.00

0.50

690

203.00

203.50

0.50

710

203.50

204.00

0.50

1100

204.00

204.50

0.50

4800

204.50

205.00

0.50

3200

205.00

205.25

0.25

5700

205.25

205.50

0.25

21100

205.50

206.00

0.50

19000

206.00

206.35

0.35

5400

206.35

206.50

0.15

11500

206.50

207.00

0.50

4700

207.00

207.50

0.50

400

207.50

208.00

0.50

2800

208.00

208.50

0.50

2600

208.50

209.00

0.50

1200

209.00

209.50

0.50

970

209.50

210.00

0.50

950

210.00

212.00

2.00

<300

212.00

212.50

0.50

580

212.50

214.00

1.50

<300

214.00

214.50

0.50

810

214.50

215.50

1.00

<300

215.50

216.00

0.50

590

216.00

216.50

0.50

500

216.50

217.00

0.50

640

217.00

217.50

0.50

420

PLN24-164

2880S

589259.5

6408356.8

538.2

-65.3

68.9

A1 MSZ Exploration; no radioactivity >300 cps

187.52

551

PLN24-165

3195S

589613.8

6408183.7

535.0

-72.4

55.0

B1 MSZ Exploration; no radioactivity >300 cps

347.18

526

PLN24-166

735S

587974.1

6410035.3

555.2

-60.4

54.9

A1 MSZ Exploration; no radioactivity >300 cps

182.33

512

PLN24-167

3450S

589969.9

6408137.0

534.4

-74.2

51.5

453.50

454.00

0.50

310

336.7

512

PLN24-168

4245S

590177.6

6407291.5

542.3

-70.3

55.3

B1 MSZ Exploration; no radioactivity >300 cps

365.08

557

 

Handheld spectrometer composite parameters:
1: Minimum Thickness of 0.5m
2: CPS Cut-Off of 300 counts per second
3: Maximum Internal Dilution of 2.
0m

Natural gamma radiation in the drill core that is reported in this news release was measured in counts per second (cps) using a handheld Radiation Solutions RS-125 scintillometer. The Company considers greater than 300 cps on the handheld spectrometer as anomalous, >10,000 cps as high grade and greater than 65,535 cps as off-scale. The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured and should be used only as a preliminary indication of the presence of radioactive materials.

All depth measurements reported are down-hole and true thickness are yet to be determined.

About Patterson Lake North:

The Company's 4,078-hectare 100% owned Patterson Lake North property (PLN) is located just within the south-western edge of the Athabasca Basin in proximity to Fission Uranium's Triple R and NexGen Energy's Arrow high-grade world class uranium deposits which is poised to become the next major area of development for new uranium operations in northern Saskatchewan. PLN is accessed by Provincial Highway 955, which transects the property, and the new JR Zone uranium discovery is located 23km northwest of Fission Uranium's Triple R deposit.

Qualified Person:

The technical information in this news release has been prepare in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and approved on behalf of the company by Raymond Ashley, P.Geo., President & COO of F3 Uranium Corp, a Qualified Person. Mr. Ashley has verified the data disclosed.

About F3 Uranium Corp.:

F3 Uranium is a uranium project generator and exploration company, focusing on projects in the Athabasca Basin, home to some of the world's largest high grade uranium discovery. F3 Uranium currently has 20 projects in the Athabasca Basin. Several of F3's projects are near large uranium discoveries including Triple R, Arrow and Hurricane. F3 has announced a transaction pursuant to which it will transfer 17 of its prospective uranium exploration properties to F4 in exchange for common shares of F4 which will be distributed to F3 shareholders on the basis of one F4 Share for every common share of F3 held; the F4 shares will then be rolled back at a rate of 10 to 1. F3 will retain the PLN Project consisting of the PLN, Misto and Broach properties. The Broach property incorporates the PW property which it obtained from CanAlaska as the result of a property swap.

Forward-Looking Statements

This news release contains certain forward-looking statements within the meaning of applicable securities laws. All statements that are not historical facts, including without limitation, statements regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions, expectations or beliefs of future performance, including statements regarding the suitability of the Properties for mining exploration, future payments, issuance of shares and work commitment funds, entry into of a definitive option agreement respecting the Properties, are "forward-looking statements." These forward-looking statements reflect the expectations or beliefs of management of the Company based on information currently available to it. Forward-looking statements are subject to a number of risks and uncertainties, including those detailed from time to time in filings made by the Company with securities regulatory authorities, which may cause actual outcomes to differ materially from those discussed in the forward-looking statements. These factors should be considered carefully and readers are cautioned not to place undue reliance on such forward-looking statements. The forward-looking statements and information contained in this news release are made as of the date hereof and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.

The TSX Venture Exchange and the Canadian Securities Exchange have not reviewed, approved or disapproved the contents of this press release, and do not accept responsibility for the adequacy or accuracy of this release.

F3 Uranium Corp.
750-1620 Dickson Avenue
Kelowna, BC V1Y9Y2

Contact Information
Investor Relations
Telephone: 778 484 8030
Email: [email protected]

ON BEHALF OF THE BOARD
"Dev Randhawa"
Dev Randhawa, CEO

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/219744

Advertisement