G2 drills 46.5 m @ 1.1 g/t Au at NW OKO Discovery

G2 Goldfields Inc.

In This Article:

TORONTO, June 03, 2024 (GLOBE NEWSWIRE) -- G2 Goldfields Inc. (“G2” or the “Company”) (TSX: GTWO; OTCQX: GUYGF) is pleased to provide an update on the Company’s new discovery at NW OKO, part of the 27,719-acre OKO-AREMU gold project, Guyana. G2 recently announced an updated Mineral Resource Estimate (“MRE”) for the project comprised of 922,000 ounces of gold (“Indicated”) and 1,099,000 ounces of gold (“Inferred”) [see press release dated April 03, 2024].

The NW OKO discovery lies an approximate distance of 3.5 km from the current established gold resource at the OKO Main/Ghanie areas [see press release dated February 13, 2024], opening up a new district for resource expansion. Geologically, NW OKO is very similar to the OKO Main/Ghanie Zone, featuring long prominent shear structures that host mineralized quartz veins which are situated near the margins of carbonaceous sediments and volcanics. To date at NW OKO, the Company has completed 58 shallow diamond drill holes totalling 5,747 metres along a 2.5 km strike length.

Figure 1

OKO District Map


Figure 1 can be viewed here

The most advanced of the discoveries to date is the Target 1 area where near surface gold mineralization has been delineated over an 800-metre strike length. Multiple diamond drill holes have intersected disseminated gold mineralization over considerable widths as well as discrete, high-grade shoots, spaced along the length of the shear zone. Highlights from recently completed diamond drill holes at the Target 1 discovery include:

Hole ID

From

To

Int (m)

Au g/t

NWOD-37

34.5

41.5

7.0

8.5

NWOD-43

166.2

174.0

7.8

4.4

NWOD-45

63.0

109.5

46.5

1.1

NWOD-49

10.5

33.5

23.0

1.1

Significant intervals calculated using 0.3 g/t Au cut-off and 6m maximum consecutive internal waste.
Gold grades are uncapped. Mineralized intersection lengths are not necessarily true widths.

Figure 2

OKO North West Target 1 - Oblique View


Figure 2 can be viewed here

A complete list of the assay results is available here.

All of the intercepts, with the exception of NWOD-43 and the lower portion of NWOD-45, are in oxidized rock within 70m of surface. See Figure 3 below.

Figure 3

OKO Target 1 Long Section - Oblique View


Figure 3 can be viewed here

Current diamond drilling is targeting the down plunge continuity of multiple near surface mineralized structures (highlighted in Figure 3), as well as expanding the strike length of this discovery to the NW and SE, where it remains open.

Aside from the Target 1 discovery, G2 will be continuing to explore other high priority targets identified to date. Specifically, Targets 2 and 3 require additional follow up work as drilling has intersected encouraging mineralization including 8m @ 1.3 g/t Au (NWOD-48A) and 15m @ 6.3 g/t Au (NWOD-22).