Graphano Expands Zone 3 at LAB Graphite Project - Reports Remaining Program Results including 15.65 Metres Grading 7.91% Cg

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - May 6, 2024) - Graphano Energy Ltd. (TSXV: GEL) (OTCQB: GELEF) (FSE: 97G0) ("Graphano" or the "Company") is pleased to report final assay results from the 2023-24 winter drilling program at its 100% owned Lac Aux Bouleaux ("LAB") Graphite Property situated adjacent to Canada's only producing graphite mine in Québec, Canada, the Lac des Iles Mine. The primary focus of the drilling program was graphite zone expansion, following up on significant results from the 2022-23 program on Zone 3.

Luisa Moreno, Chief Executive Officer of the Company, commented: "The information we obtained from the drilling program at LAB confirms the potential for a much needed ethical and sustainable mineral resource to support the development of the EV industry in North America. The drilling program confirmed the continuity of the strike and extensions of the mineralized areas in Zone 3, and we will return to LAB later in the year to continue to explore the additional zones to augment the resource potential."

Key Highlights from the LAB Zone 3 drill program (See Full Results in Table 1)

  • Highly prospective trend with multiple graphite horizons, locally folded and structurally thickened which can enhance the economic extraction potential;

  • The primary focus was graphite zone expansion to enlarge the "footprint" of mineralization in support of the Company's ongoing Mineral Resource estimation work; and

  • Mineralization is now defined over an approximate 500m strike length and mineralization remains open for further enlargement.

Current Holes

  • Drill Hole LAB24-65 intersected 7.91% graphitic carbon (Cg) over 15.65 metres (m) starting at 40.76m drilled depth; and

  • Drill Hole LAB24-66 intersected 5.28% Cg over 3.04m starting at 20.32m drilled depth.

Previous Holes

  • Drill Hole LAB23-62 intersected 6.33% Cg over 13.82m starting at 38.23m drilled depth;

  • Drill Hole LAB24-64 intersected 5.75% Cg over 14.42m starting at 53.58m drilled depth, including 7.64% Cg over 7.64m;

  • Drill Hole LB22-33 intersected 6.26% Cg over 13.7m starting at 14.0m drilled depth;

  • Drill Hole LB22-45 intersected 9.09% Cg over 8.0m starting at 68m drilled depth; and

  • Drill Hole LB22-52 intersected 7.17% Cg over 9.0m at starting at 36m drilled depth.

(Note: All intersections reported are based on drilled width - true widths will be determined with additional drilling programs.)

Three of the four holes reported in this update were drilled as step-outs, successfully extending the mineralization along the northern part of Zone 3. One exploration hole, LB24-67, was drilled on a separate target near Zone 8 and provided information about the geology in the area. The highly prospective Zone 3 trend has now been tested by trenching and drilling, at shallow depths, over an approximate 500m strike length. A total of 31 holes have been completed in Zone 3 to date. These encouraging near surface results highlight the considerable potential at LAB. The mineralization remains open in both the strike and dip directions and further exploration is warranted to follow-up this significant mineralized zone.