Scorpio Gold Completes Phase 1 of Manhattan Drill Campaign and Commences Phase 2 With an Expanded 13 Hole Program

In This Article:

Phase 1 Intercept Targeted Reliance Fault at Projected Depth in Multiple Holes

Vancouver, British Columbia--(Newsfile Corp. - August 1, 2024) - Scorpio Gold Corporation (TSXV: SGN) (OTCQB: SRCRF) (FSE: RY9) ("Scorpio Gold", "Scorpio", or the "Company") is pleased to announce completion of its Phase 1 drilling campaign ("Phase 1") as a part of the Company's 2024 exploration program (the "2024 Exploration Program" or the "Program") at its Manhattan District Project ("Manhattan"). Phase 1 commenced on June 4, 2024 and consisted of an initial five drill holes totalling 1,178 metres.

Phase 1 is being followed up with Phase 2 ("Phase 2"), commencing immediately, with the already mobilized surface diamond drilling contractors. Phase 2 is anticipated to consist of 3,109 metres across 13 holes through the rest of 2024. Manhattan is a low-sulfidation epithermal gold deposit located in Nye County, Nevada, containing a higher-grade coarse gold deposit already identified through over 100,000 metres of historic reverse-circulation drilling. Scorpio completed successful reverse-circulation drill campaigns in 2022 and 2021, both intercepting significant mineralization in multiple holes, including 16.8m of 27g/t and 41.2m of 3.98g/t. Both fire assay, and full suite multi-element inductively coupled plasma mass spectrometry (ICP) are being completed on the Phase 1 drillholes to create a multi-element library of near mine targets for understanding of mineralization and for long-term planning of grassroots targets within our claim package.

"The Phase 1 and Phase 2 holes have been planned in close coordination with our advisory team led by Daniel Kunz and his team at Daniel Kunz & Associates ("DKA"), with the dual purpose of being follow ups to historic drilling, alongside moderate step-outs of known structures to connect multiple zones of mineralization, particularly the Goldwedge underground and Manhattan West Pit," stated Harrison Pokrandt, VP of Exploration for Scorpio Gold.

Phase 1 and Phase 2 intend to extend known mineralization along strike into untested areas and bridge the Goldwedge and Manhattan targets into one larger resource. Phase 1 and Phase 2 will provide data for a preliminary metallurgical testing program, confirm previously drilled intervals at the Manhattan and Goldwedge targets, and extend understanding of the known mineralized structures. New drilling data will also aide in planning and executing a claim-wide structural mapping campaign planned for early-September. The Program's ultimate goal is to support completion of a NI 43-101 compliant resource report, with metallurgical study and review, later this year.