Independence Gold Intersects 23.00 Metres of 5.85 g/t Gold and 152.70 g/t Silver in the Ted-Mint Vein System at the 3Ts Project, BC

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - June 20, 2024) - Independence Gold Corp. (TSXV: IGO) (OTCQB: IEGCF) (the "Company" or "Independence") is pleased to announce the first assay results from the spring drill program carried out at its 100% owned 3Ts Project. The 3Ts Project is located approximately 185 kilometres ("km") southwest of Prince George, British Columbia and is comprised of seventeen mineral claims covering approximately 8,840 hectares in the Nechako Plateau region of central British Columbia. It is situated 16 km southwest of Artemis Gold Inc.'s Blackwater Project and covers a low-sulphidation epithermal quartz- carbonate vein district within which more than a dozen individual mineralized veins, ranging from 50 metres ("m") to more than 1,100 m in strike length, with true widths up to 25m, have been identified.

The spring drill program, consisting of 22 holes and totaling 5,130m, was designed to test several targets along the Ted-Mint and Tommy Vein Systems, both near surface and at depth below the sill. The program also tested early-stage exploration targets, including the Johnny and Ian veins, in order to generate additional drill data for incorporation into the current resource model (see report titled "Technical Report on the Mineral Resource Estimate Update for the 3Ts Gold Project, Omineca Mining Division, British Columbia, Canada" authored by Armitage and Miller, effective August 18th, 2022; please see news release dated August 18th, 2022 for further details). The combined in-pit and underground components of the Tommy and Ted-Mint vein systems contain a total inferred resource estimate of 4,469,297 tonnes grading 3.64 grams per tonne ("g/t") gold and 96.26 g/t silver, at a cut-off grade of 0.4 g/t gold equivalent ("AuEq") in-pit and 2.0 g/t AuEq underground, containing 522,330 ounces of gold and 13,831,415 ounces of silver, or 687,156 AuEq ounces.

The Ted-Mint Vein System is situated in the center of the 3Ts Project striking north-south for approximately one kilometre.

Highlights from the spring drill program at the Ted-Mint vein system include:

  • 3TS-24-03: 11.50m grading 9.62 g/t gold and 134.43 g/t silver

  • 3TS-24-04: 10.50m grading 2.06 g/t gold and 279.62 g/t silver

  • 3TS-24-05: 23.00m grading 5.85 g/t gold and 152.70 g/t silver

  • 3TS-24-06: 10.50m grading 4.88 g/t gold and 608.10 g/t silver

  • 3TS-24-07: 7.00m grading 12.84 g/t gold and 124.29 g/t silver

Please refer to the website for a map showing the veins and drill hole locations.