NexGen Announces Best Hole (RK-24-207) to Date and Material Expansion of Mineralized Zone at Patterson Corridor East

In This Article:

VANCOUVER, BC, Aug. 8, 2024 /PRNewswire/ - NexGen Energy Ltd. ("NexGen" or the "Company") (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce the mineralized zone at Patterson Corridor East (PCE) has materially expanded since the original discovery in the 2024 Winter Program (see NexGen News Release dated March 11, 2024). The Summer Drill Program commenced May 21st, with eight (8) out of twelve (12) drillholes intersecting mineralization to date (Figures 1 and 2, Table 1). Extensive mineralization plunges to the east with a span of 540 m along strike and 600 m vertical extent, showing wide intervals of elevated radioactivity that remain open at depth and along strike. In comparison, previously reported holes from PCE had identified two mineralized holes, 275 m apart.

Off-scale (>61,000 cps) high-grade uranium mineralization has been intersected in four drillholes to date, including RK-24-183, -197, -202, and -207. The most recent intersection in RK-24-207 contains the first instance of massive replacement by uraninite, a key indicator of a strongly mineralized system (Figures 3 and 4, Table 1) with 1.5 m >10,000 cps (including 0.3 m >61,000 cps) within cumulative interval mineralization of 26.2 m > 500 cps (Table 2).

Results include the best and most recent intercept in RK-24-207, that confirms continuity of mineralization, massive replacement uranium and significant high grade at PCE (Table 1). The high-intensity style mineralization is indicative of exceptional formation conditions linked to significant orebodies within the Athabasca Basin and most notably the Arrow Deposit 3.5 km to the west. In addition, this zone of high-intensity mineralization in RK-24-207 is at a similar depth to Arrow's A2 high-grade heart. PCE, like Arrow, is contained solely in the competent basement rock which is the ideal underground setting. The mineralized signature is expressed as very analogous to Arrow, localized veins (up to off-scale >61,000 cps) within elevated radioactivity that extends over more than 100 m.

Summer drilling to date totals 10,045.5 m of the planned 22,000 m from 12 completed drillholes. Assays from disclosed mineralized intersections are pending and due in Q4 2024.

As a consequence of these results, the focus of the summer program has substantially elevated with two primary objectives:

  • continue to test the extent of the mineralized system through bold step outs, and

  • vector in on the high-grade zones within the broader mineralized system.

Leigh Curyer, Chief Executive Officer, commented: "In the first two months of the summer program, the results have rapidly indicated an expansive, mineralized footprint with remarkable continuity. Geological characteristics are very analogous to Arrow indicating a large, pervasive and high-grade system. The summer program has been purposely bold with very large drill step outs and has intersected mineralization in an additional 8 of the 12 holes drilled. Important to note, PCE has currently hit 4 holes with intense mineralization >61,000 cps, with this occurring at Arrow for the first time in the 15th hole - which led to subsequently delineating broad ultra-high grade zones in the A2 shear of Arrow.