NorthWest Copper Discovers New Mineralized Zone at the Lorraine-Top Cat Project

NorthWest Copper Corp.
NorthWest Copper Corp.

In This Article:

First Ever Drill Assays from the Road IP Target Return 104.7 metres at 0.13% Copper

VANCOUVER, British Columbia, Oct. 10, 2024 (GLOBE NEWSWIRE) -- NorthWest Copper (“NorthWest” or “the Company”) (TSX-V: NWST) is pleased to announce the discovery of a new mineralized zone at the Lorraine-Top Cat project (the “Project”). The first ever drill assays from the Project’s Road IP Target returned 104.7 metres of 0.13% copper (“Cu”). This area has never been drilled before and the closest historical drill hole is 6.3 kilometres away. Highlights from the Project’s 2024 drill program include:

  • IP-24-002: 104.7 metres1 of 0.13% Cu from 58.3 metres downhole;

    • including 7.4 metres of 1.10% Cu from 147.6 metres downhole.

  • IP-24-001: 60.0 metres of 0.06% Cu from 127.0 metres downhole.

  • NV-24-001: 24.0 metres of 0.08% Cu from 241.0 metres downhole.

“We are very encouraged by the results from holes drilled at the Road IP and Nova Targets this summer,” said Tyler Caswell, NorthWest Copper’s VP Exploration. “We drilled two new target areas and hit base metal mineralization in all of the holes.”

“The results from this drilling support our thesis that we can find more mineralized centres outside of the existing Lorraine resource,” commented Mr. Caswell. “There is still a lot of discovery potential at Lorraine-Top Cat. The geology we are seeing at the Road IP target area is similar in style to a calc-alkalic porphyry copper system, analogous to the Central Zone at our Kwanika-Stardust project, and which is potentially a large tonnage, high-grade target type.”

Exercise of Top Cat Option
As of the date of this news release, the Company has now made all required cash payments, issued all required common share payments, and incurred the required exploration expenditures under an option agreement entered in July 2019. The Company has now acquired 100% ownership of the Top Cat claims, subject to a 3% net smelter royalty (NSR). The Company may purchase 2% of the NSR for $2,000,000 at any time prior to the first anniversary of commercial production on the Top Cat property.

2024 Lorraine-Top Cat Program
Approximately 800 metres of drilling was completed in July 2024 at the regional Nova and Road IP Targets2. The objective of the program was to expand known mineralization to areas outside of the current Lorraine mineral resource estimate (“MRE”) (indicated resources of 12.952 million tonnes (“Mt”) grading 0.55% Cu and 0.16 g/t gold (“Au”), and inferred resources of 45.252 Mt grading 0.43% Cu and 0.10 g/t Au at 0.20% copper cut-off grade)3,4. Three holes were drilled, one at the Nova Target (356 metres) and two at the Road IP Target (456 metres total). The program was successful in its objective as it discovered mineralization in two previously un-drilled target areas. Follow-up drilling is recommended at these targets to delineate size potential and the potential high-grade core of the system.