Onyx Gold Intersects Additional High-Grade Gold at the GM Vein on the Munro-Croesus Project, Ontario

In This Article:

Visible Gold Observed in Four More Holes; 52.1 g/t Au over 0.5 M in MC24-154

Vancouver, British Columbia--(Newsfile Corp. - May 1, 2024) - Onyx Gold Corp. (TSXV: ONYX) ("Onyx" or the "Company") is pleased to announce additional gold results for the next 14 drill holes from its ongoing, fully funded 3,000-meter Spring Drill Program (the "Program") at its Munro-Croesus Project ("Munro-Croesus" or the "Project") in the Timmins gold camp, Ontario.

The 14 drill holes reported today were completed at the new GM Vein, located 350 meters ("m") from the past-producing Croesus Gold Mine, which yielded some of Ontario's highest-grade gold ever mined. Highlights are provided below, with key drill results in Table 1.

  • Drilling continues to intersect encouraging results from the GM Vein at an average vertical depth of 50-60 m with visible gold observed in four of the 14 holes reported today (MC24-152/154/156/162).

  • Drilling has now defined a higher-grade shoot plunging to the southwest and the GM Vein remains open for expansion in all directions.

  • Significant assay intersections include:

    • MC24-154, a follow-up hole completed 10 m southwest from Hole MC23-132 (121.8 grams per tonne ("g/t") gold ("Au") 0.9 m - See Company press release dated December 6, 2023), returned 52.06 g/t Au over 0.5 m within a broader zone of 26.52 g/t Au over 1.0 m.

    • MC24-151, a follow-up hole completed 10 m northeast from Hole MC23-132, returned 20.44 g/t Au over 0.4 m within a broader zone of 10.97 g/t Au over 0.8 m.

    • MC24-152, a follow-up hole completed 20 m up-dip from Hole MC24-151, returned 32.31 g/t Au over 0.3 m within a broader zone of 7.68 g/t Au over 1.4 m.

    • MC24-156, a follow-up hole completed 5 m up-dip from Hole MC24-154, returned 15.52 g/t Au over 0.4 m.

  • A total of 20 holes totaling 1,713 m were drilled on the GM Vein in March and April 2024. Seventeen (17) short drill holes (MC24-143 to MC24-159) were completed across the GM Vein on three 10 meter-spaced drill fences. Two additional holes (MC24-160 and MC24-162) were completed 30 m down-plunge and 30 m up-plunge from the three main fences of holes. One hole, MC24-161, was drilled to the northeast to test for the prospective carbonaceous, sulfidic "flow top" breccia, which hosts the higher-grade portion of the Croesus Vein, 350 m to the southeast.

  • ~84% of drill holes (16 of 19 holes drilled to date) intersected mineralization greater than 0.5 g/t Au. Ten drill holes intersected mineralization over 10 g/t Au.

  • The diamond drill rig is now testing the bulk-tonnage Argus Zone located three kilometers west of the GM Vein. The remaining program meterage will be dedicated to expanding the Argus Zone beyond its current strike length of 525 m and 200 m thickness.

  • Given the encouraging results, the Program has been upsized by 10% to 3,300 m and will wind up shortly. Assay results will be released on an ongoing basis pending review and compliance with Company QA/QC protocols.