Silver Tiger Intersects 96.3 metres of 100.7 g/t silver Equivalent in the Stockwork Zone Including 1.2 metres of 4,894.1 g/t silver Equivalent within the High-Grade Keel Zone

In This Article:

HALIFAX, NS / ACCESSWIRE / August 13, 2024 / Silver Tiger Metals Inc. (TSXV:SLVR) and (OTCQX:SLVTF) ("Silver Tiger" or the "Company") is pleased to provide an update on the first 151 drill holes of the Company's Pre-Feasibility Study ("PFS") drilling program on its El Tigre Project in Sonora, Mexico. These new results are highlighting the high-grade nature of the Keel Zone while expanding near-surface mineralization footprint 700 metres from the Starter Pit.

Drill hole ET-24-617 intersected the Stockwork Zone with 96.3 metres grading 100.7 g/t silver equivalent or 1.34 g/t gold equivalent from 2.4 to 98.7 metres, consisting of 0.34 g/t gold and 75.4 g/t silver INCLUDING the high-grade SK Vein with 1.2 metres grading 4,894.1 g/t silver equivalent or 65.25 g/t gold equivalent from 97.5 to 98.7 metres, consisting of 1.96 g/t gold and 4,747.0 g/t silver (Figure 1). This hole highlights the newly discovered high-grade Keel Zone and expands Stockwork Zone 50 meters to east, over the 2023 MRE.

Figure 1 : Stockwork Zone Cross Section 4900 N

Highlighted Intersections

New intersections through the Stockwork gold deposit, comprised of the Footwall, Hanging Wall and high-grade Keel Zones, are highlighted below, shown on Figure 2 and listed in Table 1.

  • Drill hole ET-24-615: 18.4 metres grading 3.53 g/t gold equivalent or 264.5 g/t silver equivalent from surface to 18.4 metres, consisting of 1.90 g/t gold and 122.2 g/t silver AND 21.9 metres grading 0.86 g/t gold equivalent or 64.8 g/t silver equivalent from 66.3 to 88.2 metres consisting of 0.40 g/t gold and 35.2 g/t silver. The hole has expanded Hanging Wall Zone mineralization 25 metres up dip to surface over 2023 MRE.

  • Drill hole ET-24-616: 31.9 metres grading 1.85 g/t gold equivalent or 138.7 g/t silver equivalent from 61.4 to 93.3 metres, consisting of 0.14 g/t gold and 128.5 g/t silver INCLUDING 1.3 metres grading 37.04 g/t gold equivalent or 2,778.3 g/t silver equivalent from 77.4 to 78.7 metres consisting of 1.07 g/t gold and 2,698.0 g/t silver. The hole confirms Hanging Wall Zone mineralization 700 metres north of Starter Pit and expands mineralization profile 25 metres to the west.

  • Drill hole ET-24-619: 24.7 metres grading 1.06 g/t gold equivalent or 79.9 g/t silver equivalent from 3.3 to 28.0 metres, consisting of 0.39 g/t gold and 50.6 g/t silver AND 18.9 metres grading 0.41 g/t gold equivalent or 30.6 g/t silver equivalent from 41.4 to 60.3 metres consisting of 0.31 g/t gold and 7.4 g/t silver. This hole expands Stockwork mineralization to surface, some 600 metres north of the PEA ‘Starter Pit.'