Silver Tiger Intersects from Surface 79.5 Metres of 1.13 g/t Gold Equivalent Including 35.4 Metres of 2.07 g/t Gold Equivalent in the Stockwork Deposit

In This Article:

HALIFAX, NS / ACCESSWIRE / June 18, 2024 / Silver Tiger Metals Inc. (TSXV:SLVR)(OTCQX:SLVTF) ("Silver Tiger" or the "Company") is pleased to provide an update on the first 110 drill holes of the Company's Pre-Feasibility Study ("PFS") drilling program on its El Tigre Project in Sonora, Mexico. These new results are highlighting the expansion of the mineralization along the Footwall of the PEA "Starter Pit".

Drill hole ET-24-583 cut from surface 79.50 metres grading 1.13 g/t gold equivalent or 84.8 g/t silver equivalent from 0.0 to 79.50 metres, consisting of 0.97 g/t gold and 12.3 g/t silver AND 26.0 metres grading 0.72 g/t gold equivalent or 53.7 g/t silver equivalent from 101.0 to 127.0 metres, consisting of 0.67 g/t gold and 3.6 g/t silver in the Hanging Wall and Footwall Zones (Figures 1 & 2). The hole passed through the El Tigre vein and has expanded the Footwall Zone footprint some 50m to east.

Figure 1 : Stockwork Zone Cross Section 4200 N

New intersections through the Stockwork gold deposit, comprised of the Footwall, Hanging Wall and high-grade Keel Zones, are highlighted below, shown on Figure 2 and listed in Table 1.

  • Drill hole ET-24-571: 44.2 metres grading 1.00 g/t gold equivalent or 75.1 g/t silver equivalent from surface to 44.2 metres, consisting of 0.49 g/t gold and 38.4 g/t silver AND 57.0 metres grading 0.32 g/t gold equivalent or 24.0 g/t silver equivalent from 55.5 to 112.5 metres consisting of 0.31 g/t gold and 1.1 g/t silver. The former Hanging Wall intersection shows consistent, higher grades at surface in the Stater Pit area and the latter Footwall intersection expand the mineralization profile 60m to east over the 2023 MRE.

  • Drill hole ET-24-576: 41.1 metres grading 1.03 g/t gold equivalent or 77.5 g/t silver equivalent from 129.0 to 170.1 metres, consisting of 0.92 g/t gold and 8.5 g/t silver INCLUDING 14.2 metres grading 1.62 g/t gold equivalent or 121.8 g/t silver equivalent from 140.9 to 155.1 metres consisting of 1.52 g/t gold and 7.5 g/t silver gold in the Hanging Wall Zone.

  • Drill hole ET-24-580: 27.1 metres grading 0.74 g/t gold equivalent or 55.5 g/t silver equivalent from 25.9 to 53.0 metres, consisting of 0.68 g/t gold and 4.6 g/t silver in the Hanging Wall Zone AND 9.0 metres grading 1.75 g/t gold equivalent or 131.4 g/t silver equivalent from 84.0 to 93.0 metres consisting of 1.60 g/t gold and 11.5 g/t silver in the Keel Zone showing high-grade, consistent mineralization 100m to south of PEA ‘Starter Pit.

Silver Tiger's CEO, Glenn Jessome, stated, "In line with previous assay results, the Footwall and Keel Zone are showing significant potential for expansion over the 2023 MRE" Mr. Jessome further stated, "The results may increase the updated MRE associated with the PFS-level study, as well as further de-risk the project."